Comments on: South Africa’s energy crisis team unveils finance plan that could bring a just transition https://energytransition.org/2019/10/south-africas-energy-crisis-team-unveils-finance-plan-that-could-bring-a-just-transition/ The Global Energiewende Fri, 04 Sep 2020 07:12:16 +0000 hourly 1 https://wordpress.org/?v=6.1.1 By: VITTORIO TOLLARDO https://energytransition.org/2019/10/south-africas-energy-crisis-team-unveils-finance-plan-that-could-bring-a-just-transition/#comment-42459 Fri, 04 Sep 2020 07:12:16 +0000 https://energytransition.org/?p=21005#comment-42459 Main power plant in ESKOM are coal fired. KRIEL-DUVHA-many others. In order to reduce pollution hi tech sulphur detection emission by electrostatic precipitation are now available. Just need a update and replacement of this towers. Need investment on this.
Our private project finance group could help on this project financing program,…

]]>
By: James Wimberley https://energytransition.org/2019/10/south-africas-energy-crisis-team-unveils-finance-plan-that-could-bring-a-just-transition/#comment-15939 Mon, 21 Oct 2019 19:49:17 +0000 https://energytransition.org/?p=21005#comment-15939 One attractive strategy for the jobs transition is to build a lot of pumped hydro to firm the growing supply of variable wind and solar. South Africa, like may other countries, has plenty of hills and mountains over 1000m, and the world atlas of over 600,000 potential sites prepared by Andrew Blakers at ANU in Canberra lists many possibilities in SA.

These sites are off-river closed-cycle projects: you do not need to interfere with river flows or ecology significantly, and only need a modest stream to top up evaporation losses. Pumped hydro has numerous advantages over other forms of storage: it is a fully mature, century-old technology with known costs; it is the cheapest form of large-scale storage; and in construction it creates many manual jobs whose profile is a pretty good match to underground mining. The main disadvantage is that like all large-scale construction, a pumped hydro scheme takes some time, say five years from investment decision to completion, But that turns into a plus for the jobs. Pumped hydro spans a wide range of economic sizes, from 100 MW or so to to the3 GW behemoth at Bath County and Fengning..

]]>